LRI operations report, 2021-W20

1 · Aluísio Augusto Silva Gonçalves · May 25, 2021, 9 a.m.
Table of contents NixOS upgrade Peering updates Task list for 2021-W21 This is the report for 17–23 May 2021 on the state and activities of Lorkep LLYN, a virtual network and autonomous system operating on dn42. As expected, no major changes happened on the NixOS side of the network; outside that, however, a new experimental IX peering has been set up. NixOS upgrade No preliminary work on the NixOS 21.05 upgrade was done during 2021-W20, as the release-21.05 branch-off was performed on late 2...